Title | |
---|---|
The order in which test levels are performed is:The order in which test levels are performed is:
The answer is:
D. it depends on the nature of a project
|
|
System testing is aSystem testing is a
The answer is:
A. black box testing
|
|
What is “V” Model?What is “V” Model?
The answer is:
C. sdlc model
|
|
Test cases are designed during which of the following stages?Test cases are designed during which of the following stages?
The answer is:
D. test specification
|
|
The technique applied for usability testing is:The technique applied for usability testing is:
The answer is:
C. black box
|
|
Which of the following is not a Test Type?Which of the following is not a Test Type?
The answer is:
C. statement testing
|
|
White-box testing can be started:White-box testing can be started:
The answer is:
C. after programming
|
|
Beta Testing is done at:Beta Testing is done at:
The answer is:
B. user’s end
|
|
A program with high cyclometic complexity is likely to be:A program with high cyclometic complexity is likely to be:
The answer is:
D. difficult to test
|
|
Unit testing is done by:Unit testing is done by:
The answer is:
B. developers
|
|
Alpha testing is:Alpha testing is:
The answer is:
D. pre-release testing by end user representatives at the developer’s site
|
|
CASE stands forCASE stands for
The answer is:
B. computer aided software engineering
|
|
Which of the following is a drawback of using CASE tool?Which of the following is a drawback of using CASE tool?a
The answer is:
C. costs associated with the use of the tool
|
|
A client server computer program in which the client runs in a web browser is termed asA client server computer program in which the client runs in a web browser is termed as
The answer is:
A. web application
|
|
Oldest paradigm for software engineeringOldest paradigm for software engineering
The answer is:
D. waterfall model
|
|
Spiral model isSpiral model is
The answer is:
B. risk-driven model
|
|
Incremental process model phase in which modification of software product is done afterdelivery to correct faults, to improve performance or other attributes isIncremental process model phase in which modification of software product is done afterdelivery to correct faults, to improve performance or other attributes isa
The answer is:
A. maintenance framework
|
|
The intent of project metrics is:The intent of project metrics is:
The answer is:
D. minimization of development schedule and assessing project quality on ongoing basis
|
|
Architectural Design Metrics are ___________ in natureArchitectural Design Metrics are ___________ in nature.
The answer is:
A. black box
|
|
The amount of time that the software is available for use is known asThe amount of time that the software is available for use is known as
The answer is:
A. reliability
|
MCQs
Views
Best Answers
Points