MIS V-Model MCQ: This section contains the Multiple-Choice Questions & Answers on V-Model with explanations.

questions

Title
A V-model is a SDLC model and called as V-model because of its,

A V-model is a SDLC model and called as V-model because of its,


  1. Shape
  2. Size
  3. Model
  4. None of the mentioned above
discuss
The execution processes in V-model happens in a ____

The execution processes in V-model happens in a ____.


  1. Iterative in manner
  2. Sequential manner
  3. Spiral in manner
  4. All of the mentioned above
discuss
The V model is also known as,

The V model is also known as,


  1. Verification and Validation model
  2. Iterative Model
  3. Spiral Model
discuss
In V-model, each and every development phase is associated with,

In V-model, each and every development phase is associated with,


  1. Development phase
  2. Testing phase
  3. Design phase
  4. Implantation phase
discuss
In V model, Verification refers a process of evaluating a product development phase to find out whether specified requirements are meet or not

In V model, Verification refers a process of evaluating a product development phase to find out whether specified requirements are meet or not.


  1. True
  2. False
discuss
In V model, Functional and Non-functional techniques are the part of,

In V model, Functional and Non-functional techniques are the part of,


  1. Verification
  2. Validation
  3. Both A and B
  4. None of the mentioned above
discuss
In V model, Validation refers a process of evaluating a system after successfully completion to find out whether ___ and ___ are meet or not

In V model, Validation refers a process of evaluating a system after successfully completion to find out whether ___ and ___ are meet or not.


  1. Customer expectations, Requirements
  2. System development, Testing
  3. Analysis, design
  4. None of the mentioned above
discuss
The V model is an extension of the ____

The V model is an extension of the ____.


  1. Iteration model
  2. Spiral model
  3. Waterfall model
  4. None of the mentioned above
discuss
In V model, Requirement analysis refers to detailed communication with the customer to understand their ____

In V model, Requirement analysis refers to detailed communication with the customer to understand their ____.


  1. Analysis and design
  2. Requirements and expectations
  3. Testing and implementation
  4. None of the mentioned above
discuss
Amongst which of the following is a suitable option for system design phase ____

Amongst which of the following is a suitable option for system design phase ____.


  1. Physical and logical design
  2. Intermediate design
  3. Module design
  4. None of the mentioned above
discuss
Architectural Design refers to break down it further into modules,

Architectural Design refers to break down it further into modules,


  1. True
  2. False
discuss
The Module Design refers ___ for all the system modules are specified

The Module Design refers ___ for all the system modules are specified.


  1. Internal design
  2. External design
  3. Both A and B
  4. None of the mentioned above
discuss
Testing Phase of V-model includes,

Testing Phase of V-model includes,


  1. Unit Testing, Integration testing
  2. System Testing, User Acceptance Testing
  3. Both A and B
  4. None of the mentioned above
discuss
The functions of Unit testing are,

The functions of Unit testing are,


  1. Executed to eliminate errors at code level
  2. It is a smallest entity which exists as a program module
  3. Unit testing verifies the codes/ units
  4. All of the mentioned above
discuss
In integration testing, all the modules of a system are integrated and the system is tested,

In integration testing, all the modules of a system are integrated and the system is tested,


  1. True
  2. False
discuss
System test makes sure that expectations from a system developer are met

System test makes sure that expectations from a system developer are met.


  1. True
  2. False
discuss
User Acceptance Testing tests whether the product is capable enough to launch in the market or ready to work in the real world

User Acceptance Testing tests whether the product is capable enough to launch in the market or ready to work in the real world.


  1. True
  2. False
discuss
With reference to V-Model, testing is done in a hierarchical manner,

With reference to V-Model, testing is done in a hierarchical manner,


  1. True
  2. False
discuss
Amongst which of the following shows the significance of a V-Model,

Amongst which of the following shows the significance of a V-Model,


  1. Each phase of V-Model has specific deliverables and a review process
  2. Defects are found at early stage
  3. It is easy to manage
  4. All of the mentioned above
discuss
In what circumstances, a V-Model must be use?

In what circumstances, a V-Model must be use?


  1. When requirements are clearly defined
  2. When sufficient technical resources are available with technical expertise
  3. Both A and B
  4. None of the mentioned above
discuss
total MCQs: 20