MIS Iterative Model MCQ: This section contains the Multiple-Choice Questions & Answers on Iterative Model with explanations.
Title | |
---|---|
Validation is responsibility of,Validation is responsibility of,
The answer is:
C. Tester
|
|
Which one is an Iterative Model?Which one is an Iterative Model?
The answer is:
B. Figure B
|
|
Which of the following are advantages of iterative model?Which of the following are advantages of iterative model?
The answer is:
D. All of the mentioned above
|
|
Iterative model starts with some of the software specifications and develops the ___ version of the softwareIterative model starts with some of the software specifications and develops the ___ version of the software.
The answer is:
A. First
|
|
An Iterative model allows the ___ earlier phasesAn Iterative model allows the ___ earlier phases.
The answer is:
B. Accessing
|
|
Once planning is complete, a ___ is performed to nail down the appropriate business logicOnce planning is complete, a ___ is performed to nail down the appropriate business logic.
The answer is:
B. Implementation
|
|
At each iteration, ___ modifications are made and new functional capabilities are addedAt each iteration, ___ modifications are made and new functional capabilities are added.
The answer is:
B. Analysis
|
|
After completing the coding phase, system ___ starts using different test methodsAfter completing the coding phase, system ___ starts using different test methods.
The answer is:
A. Testing
|
|
Iterative Model should be used when,Iterative Model should be used when,
The answer is:
D. All of the mentioned above
|
|
In Iterative Model, a Parallel development can plan |
|
In iterative model, the iterative process starts with a simple implementation of a small set of the system ____In iterative model, the iterative process starts with a simple implementation of a small set of the system ____.
The answer is:
A. Requirement
|
|
Iterative development is used in conjunction with incremental developmentIterative development is used in conjunction with incremental development.
The answer is:
A. True
|
|
The process of Iterative Model is cyclic in nature, |
|
An iterative life cycle model does not attempt to start with a full specification of requirementsAn iterative life cycle model does not attempt to start with a full specification of requirements.
The answer is:
A. True
|
|
In iterative model we can only create a ___ design of the applicationIn iterative model we can only create a ___ design of the application.
The answer is:
B. High-level
|
|
In iterative model, we can track the ___ at early stagesIn iterative model, we can track the ___ at early stages.
The answer is:
C. Defects
|
|
This model can be helpful to know the latest technology and increment or update the model accordinglyThis model can be helpful to know the latest technology and increment or update the model accordingly.
The answer is:
D. Both B and C
|
|
Which of the followings are the pros of Iterative Model -Which of the followings are the pros of Iterative Model -
The answer is:
D. All of the mentioned above
|
|
Iterative development model is an approach of segmenting for a large software development process into smaller portionsIterative development model is an approach of segmenting for a large software development process into smaller portions.
The answer is:
A. True
|
|
In iterative model less time is spent on documenting and more time is given for designingIn iterative model less time is spent on documenting and more time is given for designing.
The answer is:
A. True
|