MIS RAD Model MCQ: This section contains the Multiple-Choice Questions & Answers on Rapid Application Development (RAD) Model with explanations.
Title | |
---|---|
The Rapid Application Development (or RAD) model is based on ___ and ___ model with no or less planningThe Rapid Application Development (or RAD) model is based on ___ and ___ model with no or less planning.
The answer is:
B. Prototyping, Iterative
|
|
In ___ model, there is less attention paid to the planning and more priority is given to the development tasksIn ___ model, there is less attention paid to the planning and more priority is given to the development tasks.
The answer is:
C. Rapid Application Development
|
|
In the RAD model, the functional modules are developed in parallelIn the RAD model, the functional modules are developed in parallel.
The answer is:
A. True
|
|
Amongst which of the following is a correct sequence of development phases of RAD model,Amongst which of the following is a correct sequence of development phases of RAD model,
The answer is:
B. Business Modeling, Data Modeling, Process Modeling, Application Generation, Testing and Turnover
|
|
RAD model is useful when a project can be broken down into small ____RAD model is useful when a project can be broken down into small ____.
The answer is:
B. Code
|
|
In RAD model, flow of ___ and distribution between various business channels, the product is designedIn RAD model, flow of ___ and distribution between various business channels, the product is designed.
The answer is:
B. Information
|
|
In RAD model, Data Modeling is based on the information collected from ___ is refined into a set of data objects that are significant for the businessIn RAD model, Data Modeling is based on the information collected from ___ is refined into a set of data objects that are significant for the business.
The answer is:
A. Business Modeling
|
|
Process Modeling refers to any changes or enhancements to the ___ sets are defined in this phaseProcess Modeling refers to any changes or enhancements to the ___ sets are defined in this phase.
The answer is:
B. Data object
|
|
___ refers to the automated tools which are used for the construction of the software, to convert process and data models into prototypes___ refers to the automated tools which are used for the construction of the software, to convert process and data models into prototypes.
The answer is:
A. Application Generation
|
|
____ refers as prototypes are individually tested during every iteration, the overall testing time is reduced in RAD____ refers as prototypes are individually tested during every iteration, the overall testing time is reduced in RAD.
The answer is:
C. Testing and Turnover
|
|
Which one of the following is / are characteristic of RAD model?Which one of the following is / are characteristic of RAD model?
The answer is:
D. All of the mentioned above
|
|
A RAD process enables a development team to create a fully functional system within a concise ___ periodA RAD process enables a development team to create a fully functional system within a concise ___ period.
The answer is:
A. Time
|
|
Rapid construction takes the prototypes and beta systems from the design phase and converts them into the ____Rapid construction takes the prototypes and beta systems from the design phase and converts them into the ____.
The answer is:
B. Working model
|
|
____ is used only when a system can be modularized to be delivered in an incremental manner____ is used only when a system can be modularized to be delivered in an incremental manner.
The answer is:
A. RAD
|
|
User feedback is gathered with heavy emphasis on determining the system ____User feedback is gathered with heavy emphasis on determining the system ____.
The answer is:
B. Architecture
|
MCQs
Views
Best Answers
Points